How soon can I drive on the new pavement?
After the hot mix asphalt has been applied and rolled, generally light vehicle traffic can resume in 1-3 hours after application. But please drive slowly to prevent damage to your vehicle or the new road surface. Remember–hotter air temperatures require longer curing times. Light rain (while reducing the pavement temperature) also presents wheel slip conditions. Always practice safe driving techniques appropriate to pavement conditions, weather conditions and ‘Rules of the Road’ in construction areas.